Three walk-throughs. All of them labelled scenarios.

Powdrix has no customer results yet, so this page does not pretend to. Each scenario describes a hypothetical machine or cell, what the agent would do at each autonomy level, and the metric table the pilot would fill in. When a design partner signs, the first real case study replaces the first scenario.

3 scenarios0 customer results claimedMetric tables, not outcomes

run_7c2e4b · agent graph · PBF-2 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.job ✓ SUCCEEDED 02 · parttwin twin.simulate ✓ SUCCEEDED 03 · prep_parameter prep.release ✓ SUCCEEDED 04 · recoat_powder recoat.check ✓ SUCCEEDED 05 · melt_layer melt.stabilise ✓ SUCCEEDED 06 · thermal_distortion thermal.compensate ✓ SUCCEEDED 07 · orchestrator approve.human ◆ APPROVAL 08 · robot_handling handle.depowder ✓ SUCCEEDED 09 · defect_inspect inspect.ct ✓ SUCCEEDED 10 · quality_conf release.qualify ✓ SUCCEEDED

Illustrative scenario: PBF-2 · Ti-6Al-4V bracket family, 24-part build, 23 of 24 parts released, one held

Scenario 01 · In-situ monitoring

Predicting lack of fusion on a metal PBF printer

A hypothetical laser powder-bed fusion printer running a qualified Ti-6Al-4V bracket family with existing coaxial melt-pool and layer cameras. Today in-situ data is reviewed after the build, if at all, and defects are found at CT.

What the agent would do

  1. Shadow mode. Meltrix fuses melt-pool video, photodiode and thermal streams at the printer edge and scores porosity, lack-of-fusion and keyhole risk per layer, per part, without writing anything.
  2. Assist mode. Meltrix flags precursors and proposes power or speed trims inside the qualified envelope; the AM process engineer approves each one, and predictions are checked against CT.
  3. Bounded autonomy. trims inside the envelope execute automatically over a few layers; anything that would leave the envelope goes to the engineer.
Meltrixscenario
What the pilot would record
MetricHowResult
Prediction accuracyprecursors confirmed by CT, before and duringto be measured
Scrapped buildsper month on the machineto be measured
Alert latencyp95 ms, against the 250 ms targetto be measured
Engineer review timehours per buildto be measured

No result is claimed. The metric table is what the pilot would record.

Scenario 02 · Inspection

Triaging every CT volume on a qualified part family

A hypothetical inspection cell with a CT scanner and metrology on a medical-implant part family. Today CT is spot-checked on a sample and reviewed manually for hours, and the qualification packet is assembled by hand.

What the agent would do

  1. Shadow mode. Poroscan segments every volume for pores, cracks and lack of fusion on the cell's GPU server and compares against the inspector's grading, without affecting disposition.
  2. Assist mode. Poroscan proposes accept, reject or rework against the acceptance criteria and assembles the citable packet; the certification engineer signs off each part.
  3. Bounded autonomy. clear accepts inside the criteria pass with the sign-off recorded; indications and borderline parts always go to the inspector.
Poroscanscenario
What the pilot would record
MetricHowResult
Triage timeminutes per volume, against the 15-minute targetto be measured
Detection agreementwith the inspector, per defect classto be measured
Packet completeness% of parts with a complete, cited packetto be measured
Escapesdefects found later that triage missedto be measured

No result is claimed. The metric table is what the pilot would record.

Scenario 03 · Build preparation

Picking the recipe before the build on a new part family

A hypothetical aerospace floor introducing a new bracket family on an existing printer. Today the recipe is found through coupon campaigns and scrapped builds over several weeks.

What the agent would do

  1. Shadow mode. Parttwin simulates the engineer's chosen recipes for thermal field, stress and distortion and predicts density and geometry, and the predictions are compared against the real builds and CT.
  2. Assist mode. Parttwin ranks candidate orientation, support and parameter recipes against density, geometry and takt and proposes the winner; the engineer releases it inside the envelope.
  3. Bounded autonomy. validated recipes for the part family are released by Prep-and-Parameter inside the envelope, with any new parameter going to the engineer.
Parttwinscenario
What the pilot would record
MetricHowResult
Coupon buildsper new part family, before and duringto be measured
Prediction errordistortion and density, twin versus metrology and CTto be measured
Ramp scrapbuilds scrapped before the recipe is stableto be measured
Time to validated recipedaysto be measured

No result is claimed. The metric table is what the pilot would record.

Run timeline · scenario

The reference scenario, step by step

Every Powdrix run is an ordered, inspectable sequence. This is run_7c2e4b on PBF-2 · Ti-6Al-4V bracket family, 24-part build. Scenario completes in 10 steps with one approval gate. Twin recipe #14 selected, one lack-of-fusion precursor at layer 1,872 cleared by a bounded power trim, CT triage in 11 minutes, 23 of 24 parts released with full genealogy and one held for review.

run_7c2e4b PBF-2 · Ti-6Al-4V bracket family, 24-part build illustrative scenario SUCCEEDED
  1. 01 ingest.job SUCCEEDED 0.7 s

    Floor Orchestrator · Pulled the job from AM MES: 24 Ti-6Al-4V brackets, 60 µm layers, 3,140 layers, density target 99.7%, geometry tolerance ±0.10 mm, AS9100 evidence packet required. Locked the OEM-approved parameter envelope for PBF-2.

  2. 02 twin.simulate SUCCEEDED 6 m 12 s

    Part Twin · Simulated 40 candidate orientation, support and parameter recipes for thermal field, residual stress and distortion, ranked on predicted density, geometry deviation, takt and energy.

  3. 03 prep.release SUCCEEDED 48 s

    Prep-and-Parameter · Recipe #14 released: 32° orientation, lattice supports on two faces, laser power and speed inside the qualified envelope. Predicted distortion 0.06 mm, predicted density 99.8%.

  4. 04 recoat.check SUCCEEDED continuous

    Recoat-and-Powder · Recoater image checked every layer. Powder lot L-2291 on its third reuse, humidity in window. One short-feed at layer 412 corrected with a dosing increase before the next layer fused.

  5. 05 melt.stabilise SUCCEEDED continuous

    Melt-and-Layer · Melt-pool, photodiode and thermal streams fused at 120 fps. Lack-of-fusion risk rose to 0.61 on part 17 at layer 1,872 and was cleared by a 3% power trim inside the envelope within four layers.

  6. 06 thermal.compensate SUCCEEDED 2 m 04 s

    Thermal-and-Distortion · Interlayer temperature on the tall brackets ran 14 °C above the twin's prediction from layer 2,300. A 1.5 s interlayer dwell held the thermal field inside the predicted band through the top section.

  7. 07 approve.human APPROVAL 4 m 30 s

    Floor Orchestrator · Melt-and-Layer proposed a hatch-spacing change on part 17 beyond the qualified envelope. Held for the AM process engineer, who declined it and chose to flag part 17 for CT priority instead. Decision logged.

  8. 08 handle.depowder SUCCEEDED 38 m

    Robot-and-Handling · Plate unloaded by the handling cell on build complete, depowdered, and parts transferred to stress relief. Powder returned to the sieve with lot L-2291 reuse count incremented in genealogy.

  9. 09 inspect.ct SUCCEEDED 11 m

    Defect-and-Inspect · 24 CT volumes segmented for pores, cracks and lack of fusion in 11 minutes. 23 parts graded accept against the acceptance criteria. Part 17 shows a 180 µm indication at layer 1,870 and is routed to the inspector for disposition.

  10. 10 release.qualify SUCCEEDED 1 m 20 s

    Quality-and-Conformance · 23 parts released with the full genealogy: recipe, layer tags, melt-pool events, thermal trace, approvals, post-processing cycles and CT result. Part 17 held with a non-conformance opened. Evidence packet assembled for sign-off.

Tool calls · scenario

The agent shows its work

Every tool invocation, argument and result is written to an append-only, human-readable log, and every reasoning step is expandable. Nothing about a build is hidden from the floor or from the certification engineer.

tool-call stream · run_7c2e4b · timestamps span a 31-hour build
  1. 05:10:04mes.read_job({ printer: "PBF-2", job: "J-4471" })
  2. 05:10:05ok 24 parts · Ti-6Al-4V · 3,140 layers · envelope locked
  3. 05:10:05twin.simulate({ candidates: 40, targets: ["density", "geometry", "takt"] })
  4. 05:16:17ok best recipe #14 · distortion 0.06 mm · density 99.8% · takt 31.2 h
  5. 05:16:18policy.evaluate({ recipe: 14, autonomy: "L3" })
  6. 05:16:18ok recipe inside envelope · 6 bounded writes permitted
  7. 05:16:19printer.release_recipe({ id: 14, orientation: 32, supports: "lattice" })
  8. 05:17:07ok build started · layer 1 of 3,140
  9. 06:02:40recoat: short feed at layer 412 · dosing +4% applied
  10. 13:48:11precursor: lack-of-fusion risk 0.61 · part 17 · layer 1,872
  11. 13:48:12printer.trim_power({ part: 17, delta: "-3%", layers: 4 })
  12. 13:49:03ok risk 0.61 → 0.08 · pool stable
  13. 13:49:04approval.request({ action: "hatch_change", part: 17 })
  14. 13:53:34ok declined by AM process engineer · part 17 flagged CT priority
  15. 18:21:50printer.set_dwell({ interlayer: "+1.5 s", from_layer: 2300 })
  16. 18:23:54ok thermal field inside predicted band
  17. 12:20:30isaac.plan_grasp({ task: "unload_plate", cell: "RC-1" })
  18. 12:58:30ok depowdered · 24 parts to stress relief · lot L-2291 reuse 4
  19. 14:05:02ct.segment({ volumes: 24, criteria: "BRK-TI-A" })
  20. 14:16:02ok 23 accept · 1 indication 180 µm · part 17 → inspector
  21. 14:16:03packet.sign({ job: "J-4471", parts: 23, hold: [17] })
  22. 14:17:23ok scenario complete · 23 released · 1 NCR opened

Reasoning trace

Plan, thought, action, observation, exactly as the orchestrator would record it.

GoalRun job J-4471, 24 Ti-6Al-4V brackets on PBF-2, to 99.7% densi…

Run job J-4471, 24 Ti-6Al-4V brackets on PBF-2, to 99.7% density and ±0.10 mm, with an AS9100 evidence packet on every released part.

PlanSimulate the recipe on the twin first. Release only inside the…

Simulate the recipe on the twin first. Release only inside the qualified envelope. Watch recoat and melt pool every layer, compensate thermally against the twin, and route anything outside the envelope to the process engineer. Triage every part by CT before release.

ThoughtThree candidate recipes beat #14 on takt but predicted distort…

Three candidate recipes beat #14 on takt but predicted distortion above 0.08 mm on the tall brackets. Takt is not worth a geometry failure on a qualified part family. Recipe #14 wins on the stated targets.

Actiontwin.simulate(candidates=40) returns recipe #14: 32° orientati…

twin.simulate(candidates=40) returns recipe #14: 32° orientation, lattice supports, power and speed inside the envelope, predicted distortion 0.06 mm.

ObservationLack-of-fusion risk 0.61 on part 17 at layer 1,872. A 3% power…

Lack-of-fusion risk 0.61 on part 17 at layer 1,872. A 3% power trim, inside the envelope, clears it in four layers. The proposed hatch change would leave the envelope, so it goes to a human and is declined.

ActionFlag part 17 for CT priority. Hold interlayer dwell at +1.5 s …

Flag part 17 for CT priority. Hold interlayer dwell at +1.5 s from layer 2,300 to keep the thermal field inside the twin's band.

ObservationCT confirms a 180 µm indication on part 17 at layer 1,870, two…

CT confirms a 180 µm indication on part 17 at layer 1,870, two layers below the precursor. The other 23 parts grade accept. The precursor, the action and the CT result are now one linked record.

OutcomeScenario complete. 23 parts released with full genealogy, part…

Scenario complete. 23 parts released with full genealogy, part 17 held with a non-conformance, CT triage in 11 minutes, no unapproved parameter left the envelope.

Autonomy

Four levels, set per agent and per machine

A qualified floor does not go from manual to unattended in one step. Powdrix makes the level explicit, auditable and reversible at any time, and human approval for anything that affects qualification stays mandatory until validation exists. The first release runs shadow mode, then assist mode, then graduated autonomy.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · AdvisoryPredicts and recommends, with citations; nothing is writtenEnters every change manuallyShadow mode on one machine, first weeks of a pilot
L2 · SupervisedProposes a parameter, thermal or inspection move; it executes on approvalApproves each move in the review consoleAssist mode once accuracy is measured against CT
L3 · BoundedWrites inside the OEM-approved parameter envelope and per-tag limitsApproves anything that leaves the envelope or affects qualificationGraduated autonomy on low-risk loops, if the floor is satisfied
L4 · UnattendedRuns the envelope without promptingSets the envelope; reviews the shift recordPlanned; only after validation on the part family
FAQ

Straight answers

The questions operations directors, process engineers and certification engineers ask in the first meeting.

Only inside the OEM-approved parameter envelope, only on an explicit allow-list with per-tag limits, and only at the autonomy level your floor has set. Level 1 is advisory: Powdrix predicts and recommends and a human enters everything. Design partners start there, in shadow mode. Anything that leaves the envelope or affects qualification always waits for a named approver.

Get started

Make the first scenario real

Start with one printer or one inspection cell and one measurable baseline. A paid pilot on melt-pool and build-failure prediction, CT porosity triage or pre-build recipe optimisation shows the number before you commit further.