Careers

Work on software that watches a melt pool at 240 frames a second.

Powdrix is pre-launch and building its founding team. The four roles below are the ones we expect to open first, written as honestly as we can about the stage: there is no office to show, no customer list, and the first job is a paid pilot on one machine.

4 founding rolesPre-launchEdge, OT, simulation, process

run_7c2e4b · agent graph · PBF-2 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.job ✓ SUCCEEDED 02 · parttwin twin.simulate ✓ SUCCEEDED 03 · prep_parameter prep.release ✓ SUCCEEDED 04 · recoat_powder recoat.check ✓ SUCCEEDED 05 · melt_layer melt.stabilise ✓ SUCCEEDED 06 · thermal_distortion thermal.compensate ✓ SUCCEEDED 07 · orchestrator approve.human ◆ APPROVAL 08 · robot_handling handle.depowder ✓ SUCCEEDED 09 · defect_inspect inspect.ct ✓ SUCCEEDED 10 · quality_conf release.qualify ✓ SUCCEEDED

Illustrative scenario: PBF-2 · Ti-6Al-4V bracket family, 24-part build, 23 of 24 parts released, one held

Founding roles

Where we need people

Role descriptions, not an openings count. Each is a founding role.

Founding role · 01

Founding edge perception engineer

Jetson Orin, DeepStream, Holoscan, TensorRT. Fuse melt-pool video, photodiode and thermal streams into one model of build health at layer rate.

Founding role · 02

Founding controls and OT integration engineer

Printer, oven, HIP and robot-cell connectors. Parameter envelopes, bounded writes, approvals, rollback and the assurance-grade audit log.

Founding role · 03

Founding simulation engineer

Omniverse part twin, thermal and distortion simulation, physics-informed surrogates, cuOpt nesting and scheduling, synthetic scenario generation.

Founding role · 04

Founding AM process engineer

Someone who has qualified a part family on metal PBF. Translate parameter craft and qualification practice into envelopes, metrics and acceptance tests for design partners.

How we work

Six things about working here

01

The floor is the customer

We measure ourselves on scrapped builds, CT hours, coupon campaigns and idle machines, the floor's own numbers.

02

Nothing unlabelled

A design target is called a design target. A scenario is called a scenario. A cited standard is not a certification. We do not round up.

03

Qualification is a feature

The envelope, the approvals and the assurance-grade audit log are the product, not overhead.

04

Simulate first

A recipe is rehearsed on the twin before it is released. So are our own changes.

05

Write it down

Every decision, every run, every correction goes into a record someone else can audit.

06

Go to the floor

The craft we are encoding lives next to the printer. We go there.

Run timeline · scenario

What you would be building

Every Powdrix run is an ordered, inspectable sequence. This is run_7c2e4b on PBF-2 · Ti-6Al-4V bracket family, 24-part build. Scenario completes in 10 steps with one approval gate. Twin recipe #14 selected, one lack-of-fusion precursor at layer 1,872 cleared by a bounded power trim, CT triage in 11 minutes, 23 of 24 parts released with full genealogy and one held for review.

run_7c2e4b PBF-2 · Ti-6Al-4V bracket family, 24-part build illustrative scenario SUCCEEDED
  1. 01 ingest.job SUCCEEDED 0.7 s

    Floor Orchestrator · Pulled the job from AM MES: 24 Ti-6Al-4V brackets, 60 µm layers, 3,140 layers, density target 99.7%, geometry tolerance ±0.10 mm, AS9100 evidence packet required. Locked the OEM-approved parameter envelope for PBF-2.

  2. 02 twin.simulate SUCCEEDED 6 m 12 s

    Part Twin · Simulated 40 candidate orientation, support and parameter recipes for thermal field, residual stress and distortion, ranked on predicted density, geometry deviation, takt and energy.

  3. 03 prep.release SUCCEEDED 48 s

    Prep-and-Parameter · Recipe #14 released: 32° orientation, lattice supports on two faces, laser power and speed inside the qualified envelope. Predicted distortion 0.06 mm, predicted density 99.8%.

  4. 04 recoat.check SUCCEEDED continuous

    Recoat-and-Powder · Recoater image checked every layer. Powder lot L-2291 on its third reuse, humidity in window. One short-feed at layer 412 corrected with a dosing increase before the next layer fused.

  5. 05 melt.stabilise SUCCEEDED continuous

    Melt-and-Layer · Melt-pool, photodiode and thermal streams fused at 120 fps. Lack-of-fusion risk rose to 0.61 on part 17 at layer 1,872 and was cleared by a 3% power trim inside the envelope within four layers.

  6. 06 thermal.compensate SUCCEEDED 2 m 04 s

    Thermal-and-Distortion · Interlayer temperature on the tall brackets ran 14 °C above the twin's prediction from layer 2,300. A 1.5 s interlayer dwell held the thermal field inside the predicted band through the top section.

  7. 07 approve.human APPROVAL 4 m 30 s

    Floor Orchestrator · Melt-and-Layer proposed a hatch-spacing change on part 17 beyond the qualified envelope. Held for the AM process engineer, who declined it and chose to flag part 17 for CT priority instead. Decision logged.

  8. 08 handle.depowder SUCCEEDED 38 m

    Robot-and-Handling · Plate unloaded by the handling cell on build complete, depowdered, and parts transferred to stress relief. Powder returned to the sieve with lot L-2291 reuse count incremented in genealogy.

  9. 09 inspect.ct SUCCEEDED 11 m

    Defect-and-Inspect · 24 CT volumes segmented for pores, cracks and lack of fusion in 11 minutes. 23 parts graded accept against the acceptance criteria. Part 17 shows a 180 µm indication at layer 1,870 and is routed to the inspector for disposition.

  10. 10 release.qualify SUCCEEDED 1 m 20 s

    Quality-and-Conformance · 23 parts released with the full genealogy: recipe, layer tags, melt-pool events, thermal trace, approvals, post-processing cycles and CT result. Part 17 held with a non-conformance opened. Evidence packet assembled for sign-off.

Process

How hiring runs

  1. Write to us. What you would own, what you have built or qualified, and why this floor.
  2. A conversation. An hour on the problem, not a quiz.
  3. A working session. A real design question from the backlog, worked together.
  4. References and an offer. Founding terms, discussed openly.
Accelerated computing

Physical AI, at the melt pool

A build is thousands of layers and a day of machine time. Perception has to be local, deterministic and fast, CT has to be triaged in minutes, and the twin has to run before the build. Powdrix runs GPU inference at the printer edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

One Jetson node per printer for 30 to 240 fps melt-pool, layer and recoater streams with photodiode and thermal fusion. Sub-250 ms alerting and 1 to 2 s bounded recommendations are the design targets. Jetson Thor is planned for multi-laser machines.

Triton · TensorRT · L4, L40S, A100

CT and vision inference

2D and 3D segmentation models for porosity, cracks, lack of fusion, surface defects and metrology comparison, served per inspection cell. Sub-15-minute CT triage per build is the design target.

DGX or HGX · NeMo

Training

Defect, melt-pool-instability, build-failure and AM reasoning models trained weekly over multimodal build data, with gated promotion from shadow to assist to bounded. Dedicated capacity is planned.

Omniverse · OVX

Part twin

Thermal, melt-pool-proxy, residual-stress and distortion simulation for recipe ranking, plus robot-cell and queue simulation. Modulus surrogates are planned so sweeps run at production cadence.

Cosmos · Omniverse Replicator

Synthetic data

Rare pore, lack-of-fusion, spatter, recoat-streak and distortion scenarios generated and validated against real CT and in-situ data before promotion. 1,000 to 10,000 per qualified part family is the initial target.

cuOpt · RAPIDS

Optimisation and analytics

Build nesting, fleet scheduling across machines, ovens, HIP, inspection and robots, energy windows, and GPU analytics over genealogy tables.

Isaac · Isaac Sim · NIM

Robot handling and serving

Plate, powder and part handling policies trained in simulation and run on Jetson in the cell. NIM packages perception, prediction and reasoning services behind the floor orchestrator.

Autonomy

Four levels, set per agent and per machine

A qualified floor does not go from manual to unattended in one step. Powdrix makes the level explicit, auditable and reversible at any time, and human approval for anything that affects qualification stays mandatory until validation exists. The first release runs shadow mode, then assist mode, then graduated autonomy.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · AdvisoryPredicts and recommends, with citations; nothing is writtenEnters every change manuallyShadow mode on one machine, first weeks of a pilot
L2 · SupervisedProposes a parameter, thermal or inspection move; it executes on approvalApproves each move in the review consoleAssist mode once accuracy is measured against CT
L3 · BoundedWrites inside the OEM-approved parameter envelope and per-tag limitsApproves anything that leaves the envelope or affects qualificationGraduated autonomy on low-risk loops, if the floor is satisfied
L4 · UnattendedRuns the envelope without promptingSets the envelope; reviews the shift recordPlanned; only after validation on the part family
Guardrails

An agent that can trim laser power needs a leash

Powdrix writes to production printers that make qualified parts. Every capability is scoped to the qualified envelope, every write is policy-checked, and every action is written to an append-only audit log the floor owns.

  • Bounded action space. Each agent writes only to an explicit allow-list of printer, oven and cell parameters, inside the OEM-approved envelope and per-tag rate and magnitude limits.
  • Policy engine before every write. Autonomy level, part family, qualification status, machine state and operator presence are evaluated before a parameter moves.
  • Human approval for qualification-impacting actions. Anything that leaves the qualified envelope, changes a validated recipe or affects a part's disposition waits for a named approver. This stays mandatory until validation exists.
  • Immutable audit log. Append-only and exportable. Every action records model version, data lineage, source signals, predicted impact, allowed range, approval status and qualification impact.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the printer's own controller and the standing recipe.
  • Tenant and IP isolation. Parameter sets, part geometry, defect libraries and process memory never cross a customer boundary. On-prem deployment is available for sensitive producers.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
AS9100 and ISO 13485 assurance packagesEvidence packets and model change control QUEUED Planned, 6 to 12 months; not a certification claim
Standards-cited reasoningAS9100, ISO 13485, ASTM F42, ISO 52900 RUNNING In the design, every answer cites its source
Per-tenant isolation and on-prem optionRecipes, geometry, models, memory RUNNING In the design from day one

Read the security overview

FAQ

Straight answers

The questions operations directors, process engineers and certification engineers ask in the first meeting.

Only inside the OEM-approved parameter envelope, only on an explicit allow-list with per-tag limits, and only at the autonomy level your floor has set. Level 1 is advisory: Powdrix predicts and recommends and a human enters everything. Design partners start there, in shadow mode. Anything that leaves the envelope or affects qualification always waits for a named approver.

Get started

Tell us what you want to own

Write to hello@powdrix.com with the role and what you have built.